Optimisation of the Partial Runner Set-up Process in Plastic Injection Moulds Using Eight Steps in the Motorcycle Industry. (2024). Quality Innovation Prosperity, 28(1), 223-240. https://doi.org/10.12776/qip.v28i1.1980