Setiawan, I., Perdana, B. C. and Aisa, N. N. (2024) “Optimisation of the Partial Runner Set-up Process in Plastic Injection Moulds Using Eight Steps in the Motorcycle Industry”, Quality Innovation Prosperity, 28(1), pp. 223–240. doi: 10.12776/qip.v28i1.1980.